Mugello Hospital Facility

Florence

Type:

Hospital architecture

Client:

Azienda USL Toscana Centro

Services and scope of the assignment:

Final and executive design, Safety coordination during design and execution, Site management

Project numbers:

Built: 15,000 sqm
Amount: € 28,531,285.00

Tecnicaer - Presidio Ospedaliero del Mugello

Find out all the information and development of the project:Mugello Hospital Facility

The project, born from the primary need for structural adaptation, in addition to significant structural intervention, includes numerous improvements aimed at ensuring, optimizing, and making functional services self-sufficient from a technical-health point of view. The redevelopment of the Mugello Hospital will bring the structure, after many years of waiting, to be a fundamental healthcare cornerstone for the territory and beyond.

Our project includes significant interventions in building, systems, and healthcare fields, with renovations, modernizations, and expansions. Thanks to careful study of the positioning of spaces and the physical and functional connections between processes, safety conditions will be high, and clinical risk contained, a necessity felt more than ever today, and whose satisfaction will increase the well-being of all users.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.