Autorizzazioni Senza Complicazioni

Road Closure Permit for Major Works

With the growing spread of electric mobility, installing charging stations has become a necessity for private individuals, businesses and public facilities. However, when the installation involves public areas or spaces accessible from the road, specific municipal authorisation is required.

Whether it’s infrastructure for private use but with public access (such as one installed in front of a shop or condominium), or a charging station open to everyone, the application must comply with technical, planning and safety regulations. Only with the permit can you proceed legally and access any available incentives or benefits.

Applications to install electric vehicle charging points on public land can only be submitted by authorised CPOs (charging point operators).

Trova tutte le informazioni utili riguardo la Road Closure Permit for Major Works

When a Road Closure Permit for Major Works Is Required

A permit is mandatory whenever major works require the full or partial closure of roads, lanes or junctions. Failure to apply can lead to penalties, work stoppages and problems with the local authorities.

What the Road Closure Permit Covers

The permit allows works that temporarily interrupt traffic to be carried out, ensuring safety, coordination with the local police and orderly traffic management.

Who This Service Is For

Our service is designed for:

  • Construction and road maintenance companies
  • Public or private clients
  • Companies needing to work with large vehicles or invasive equipment

What Our Full Service Includes

Our service includes:

  • Technical analysis of the road section involved
  • Preparation of the technical documentation and alternative traffic plans
  • Submission of the request to municipal offices and the local police
  • Coordination with the authorities involved through to the issuing of the permit

Documents Required

Generally required:

  • Site plan of the area to be closed
  • Description of the works and the expected duration
  • ID document of the applicant
  • Temporary road signage plan
  • Specific municipal form

Timeframes and Costs

Average time: 7–20 working days, depending on the complexity of the works
Costs: vary depending on the size of the area, the duration and the municipality. We offer free, tailored quotes.

What Happens Without a Permit + Frequently Asked Questions

Consequences of not obtaining authorisation:

  • Fines that can exceed €1,000
  • Work stoppages ordered by the authorities
  • Civil and criminal liability in the event of accidents

F.A.Q.

road closure

Is a permit required for private use too?

Yes, if the charging station is on public land or in a condominium area that’s open and visible from the street. A permit application is required in these cases as well.

Can I reserve a parking space?

Yes, but it must be explicitly requested from the municipality. If approved, the space will be marked and protected with the required vertical and horizontal road signage.

Who can install the charging station?

Only a qualified installer, in compliance with CEI standards and municipal requirements. Our firm can help you select the right professional and ensure the correct procedures are followed.

Mandami pure il prossimo articolo quando vuoi.

Richiesta Preventivo

Hai bisogno di occupare il suolo pubblico e vuoi sapere tempi, costi e documenti necessari?

Compila il form con le informazioni principali: ti risponderemo in breve tempo con un preventivo personalizzato, chiaro e senza impegno.

Ogni richiesta viene valutata con attenzione, per offrirti una stima precisa e trasparente, in base alla tipologia di occupazione e alla normativa comunale vigente.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.